Mega dam expansion to boost Yangtze economic belt
China launched a colossal infrastructure project on Monday to expand the Three Gorges Dam's navigation system in Yichang, Hubei province, marking another milestone effort designed to eliminate chronic shipping capacity bottlenecks and supercharge the industrial arteries of the nation's vast economy.
With a total investment of approximately 77.2 billion yuan ($11.39 billion), the mega project comprises two core components: a new channel at the Three Gorges Hub and a shipping capacity expansion at the downstream Gezhouba Dam.
At the Three Gorges Hub, two new ship locks will be built after excavating the mountain on the left bank, parallel to the existing dual-line locks. Once completed, the hub will boast a four-lane lock configuration, according to operator China Three Gorges Corp.
Combined with the existing ship lift, the hub's total annual throughput capacity will surge to 336 million metric tons, the operator said. In 2025, the total freight volume passing through the Three Gorges Hub stood at 173 million metric tons.
The concurrent Gezhouba expansion involves dismantling its No 3 lock to construct two new single-stage locks on the left side, thus expanding the approach channels. This will take Gezhouba's total capacity to 360 million tons annually, it said.
The Yangtze River Economic Belt, spanning 11 provinces and municipalities, accounts for over 40 percent of the nation's population and GDP. Its industries, ranging from metallurgy and automotives to high-tech manufacturing, rely heavily on the river for transportation of 85 percent of the region's iron ore and foreign trade goods, as well as 83 percent of its coal.
Su Fengming, a researcher at the National Development and Reform Commission's Institute of Comprehensive Transportation, highlighted the waterway's indispensable economic role.
"In 2025, the Yangtze River Economic Belt's GDP exceeded 65 trillion yuan, with mainline port cargo throughput hitting 4.2 billion tons — surpassing the national railway cargo throughput total by over 80 percent," Su said.
Su noted that water transportation costs a mere one-fifth of rail transit, solidifying the river's position as the economic "main artery" as manufacturing and industrial bases increasingly shift toward the inland geographic center.
According to Niu Xinqiang, an academician of the Chinese Academy of Engineering, mainline freight volume on the Yangtze River has grown continuously over the past two decades, rising from 650 million tons in 2005 to 4.2 billion tons by 2025 — ranking first among global inland rivers for 20 consecutive years.
This rapid growth has strained the existing infrastructure's ship handling capacity, he said.
Niu said he believes that the new channel will elevate the hub's one-way design capacity from roughly 50 million tons to 168 million tons by 2050. This will accelerate the flow of key production factors and help bridge the gap between the nation's eastern and western regions, he said.
相关文章
阿尔伯塔大学:本科申请条件全解析坐落于加拿大阿尔伯塔省的阿尔伯塔大学,以浓厚的学术底蕴、强劲的科研实力与原谅的校园氛围,成为繁多学子奔赴海外求学的理想之选。想要顺畅打开本科求学之旅,清楚学会申请要求2026-10-08
这几天,杭州二中白马湖学校向全体师生,发出了一封《关于合理使用社交媒体倡议书》,建议同学们在16周岁之前,尽量远离社交媒体,不注册社交账号。这条倡议,很快就引起了大量讨论。关于未成年人使用社交媒体账号2026-10-08
百年杰出,值得庆祝——墨尔本大学商学与经济学院Faculty of Business and Economics)正在通过一场全球巡回活动,纪念其百年华诞,诚挚邀请广大校友参与其中。 商学与2026-10-08
新华社首尔9月11日电记者张粲孙一然)韩国首尔中央地方法院11日对前总统尹锡悦涉嫌使犯罪嫌疑人逃避司法追究等一案作出一审判决,判处尹锡悦无罪。2026-10-08
2026-10-08
签证被行政审核了,我能做些什么? 在面谈结尾,签证官告知申请人签证申请需要进一步的行政审理时,首先需要确定申请人是否被要求提交其他信息或补充材料。如确定是,那么申请人需要按照221(g)行政审核单上的2026-10-08

最新评论