Mega dam expansion to boost Yangtze economic belt
China launched a colossal infrastructure project on Monday to expand the Three Gorges Dam's navigation system in Yichang, Hubei province, marking another milestone effort designed to eliminate chronic shipping capacity bottlenecks and supercharge the industrial arteries of the nation's vast economy.
With a total investment of approximately 77.2 billion yuan ($11.39 billion), the mega project comprises two core components: a new channel at the Three Gorges Hub and a shipping capacity expansion at the downstream Gezhouba Dam.
At the Three Gorges Hub, two new ship locks will be built after excavating the mountain on the left bank, parallel to the existing dual-line locks. Once completed, the hub will boast a four-lane lock configuration, according to operator China Three Gorges Corp.
Combined with the existing ship lift, the hub's total annual throughput capacity will surge to 336 million metric tons, the operator said. In 2025, the total freight volume passing through the Three Gorges Hub stood at 173 million metric tons.
The concurrent Gezhouba expansion involves dismantling its No 3 lock to construct two new single-stage locks on the left side, thus expanding the approach channels. This will take Gezhouba's total capacity to 360 million tons annually, it said.
The Yangtze River Economic Belt, spanning 11 provinces and municipalities, accounts for over 40 percent of the nation's population and GDP. Its industries, ranging from metallurgy and automotives to high-tech manufacturing, rely heavily on the river for transportation of 85 percent of the region's iron ore and foreign trade goods, as well as 83 percent of its coal.
Su Fengming, a researcher at the National Development and Reform Commission's Institute of Comprehensive Transportation, highlighted the waterway's indispensable economic role.
"In 2025, the Yangtze River Economic Belt's GDP exceeded 65 trillion yuan, with mainline port cargo throughput hitting 4.2 billion tons — surpassing the national railway cargo throughput total by over 80 percent," Su said.
Su noted that water transportation costs a mere one-fifth of rail transit, solidifying the river's position as the economic "main artery" as manufacturing and industrial bases increasingly shift toward the inland geographic center.
According to Niu Xinqiang, an academician of the Chinese Academy of Engineering, mainline freight volume on the Yangtze River has grown continuously over the past two decades, rising from 650 million tons in 2005 to 4.2 billion tons by 2025 — ranking first among global inland rivers for 20 consecutive years.
This rapid growth has strained the existing infrastructure's ship handling capacity, he said.
Niu said he believes that the new channel will elevate the hub's one-way design capacity from roughly 50 million tons to 168 million tons by 2050. This will accelerate the flow of key production factors and help bridge the gap between the nation's eastern and western regions, he said.
相关文章
汇通财经APP讯——周三亚洲时段,现货黄金延续震荡,交投于4160美元/盎司附近,前一交易日金价上涨约0.6%收于4164美元。推动这轮反弹的直接因素来自债市与能源市场同步降温:美国10年期国债收益率2026-10-08
边民李本怡在甘蔗地里劳作。南方周末记者赵明摄2023年底,我曾做过一篇关于网络短剧的报道,当时的一个疑惑是,短剧剧情如此奇葩,但是流量却如此惊人,究竟是什么样的群体在看短剧?2024年初,我去中缅边境2026-10-08
阿尔伯塔大学是加拿大的一所知名高等学府,以其杰出的教育质量和科研成就吸引了世界各地的学生。作为加拿大顶尖的大学之一,阿尔伯塔大学在各个学科领域,尤其是科学、工程、商学和人文学科方面,拥有重要的影2026-10-08
伊朗常驻联合国日内瓦办事处代表阿里·巴赫雷尼23日表示,霍尔木兹海峡已对商船完全开放,且不收取任何费用。巴赫雷尼当天就伊朗和美国谈判情况回答联合国日内瓦记者协会的提问时说,霍尔木兹海峡现已开放,为期62026-10-08
一张图:2026年10月6日黄金原油外汇股指“枢纽点+多空持仓信号”一览
汇通财经APP讯——一张图:2026年10月6日黄金原油外汇股指“枢纽点+多空持仓信号”一览。今日(2026年10月6日周二)最新出炉的数据显示,截止刚刚,本图表中,最新处于“超买”状态(多头超过802026-10-08
△伊朗总统佩泽希齐扬资料图)当地时间23日,正在巴基斯坦访问的伊朗总统佩泽希齐扬在接受采访时表示,伊美谅解备忘录中并不包含导弹问题,未来也不会将其纳入议题。佩泽希齐扬称,伊朗永远不会与任何人协商伊朗方2026-10-08

最新评论